How a job runs
From the first photo you send to the day we install.
- Call
Call, or use the quote form. The most useful things to send: a photo of the space, rough length or number of steps, and the style you're picturing. A screenshot from anywhere is fine. You'll hear back within two business days with a ballpark or a time to come measure.
- Measure
Stairs, rail on stairs and anything structural get measured on site. About an hour on a normal house. We check rise and run, where posts can actually land, what the rail mounts into, and whether the floor is level. It usually isn't.
- Draw
You get a drawing with dimensions, the material, the finish and a price. Commercial jobs get shop drawings off the architect's sheets. Nothing gets cut until you sign off.
- Schedule
A deposit locks your spot and covers material. You get a realistic install window, not a best case.
- Build
Built and fit-checked in the shop. On most rail jobs we tack it together, check it against the measurements, then finish-weld and grind.
- Finish
Powder coat goes to a local coater and usually adds about a week. Paint and clear coat happen in-house. Compare finishes.
- Install
Our crew installs. Most residential rail installs take one day. We clean up and walk it with you before we leave.
How long it takes
From a signed drawing to install day, most interior stair rails and deck rails take three to five weeks. Driveway gates run four to six, because the posts go in first and the concrete has to cure. Commercial stairs follow the job schedule.
What stretches a job: a backlog at the powder coater, special-order stainless or cable hardware, and rain on outdoor installs.